
Initial Startup
98
8 Place a ruler across the back of the meter to check
that the battery pack is properly positioned. The
ruler should lie completely flat, touching both sides
of the meter on the left and right of the battery pack
(see left image above). If this is not the case (as
shown in the right image above), carefully loosen
the screws again and start over with step 1.
After inserting a new battery pack, the meter powers on
automatically.
■ The Roche logo is displayed. If the meter does not
power on automatically, perform a reset. To do this,
press the reset button in the middle of the battery
pack using a tool such as a screwdriver or a paper
clip.
■ Within a short period of time, the start screen
should appear.
■ Depending on how long the meter was without
power, a time/date verification message may
appear. If the time and date is correct, press .
If it is not correct, press and update the
information accordingly. Follow the prompts on
screen or contact the system administrator.
After installing a new battery pack, the meter should be
charged for three hours in the base unit before testing.
Kommentare zu diesen Handbüchern