Roche CoaguChek XS System Betreibershandbuch Seite 26

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 156
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 25
Putting the Meter into Operation
26
Powering the meter on and off
3 Slide the battery compartment back onto
the meter and close it.
The meter powers itself on after the
batteries have been inserted.
1 Place the meter on a level, vibration-free
surface, or hold it in your hand so it is
roughly horizontal.
2 Power the meter on by pressing the
button for approximately 1 second.
You can also power on the meter directly by
inserting a test strip or connecting the power
adapter.
3 To power the meter off after use, press the
button for approximately 1 second.
Seitenansicht 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 155 156

Kommentare zu diesen Handbüchern

Keine Kommentare